Two separate additions were designed to increase classroom space, provide elevator service, and upgrade essential building systems. With a distinct campus aesthetic, the design integrated new and existing elements of the structure and Joan guided us through the design process. Final construction documents and construction administration were our firm’s responsibility and we are proud of the results.